SHANGHAI PORT GUIDE

Quick Facts

InformationDetails
Port AuthorityShanghai International Port Group (SIPG)
CountryChina
UN/LOCODECNSHA
Port TypeDeep Water International Commercial Port
Main CargoContainers, Bulk, Breakbulk, Liquid Cargo, Ro-Ro
Operational Status24 Hours
Time ZoneUTC +8

Pilot Boarding Area

Pilot boarding is mandatory for virtually all foreign-going commercial vessels.

Pilot stations vary depending on:

  • Vessel draft
  • Assigned terminal
  • Cargo type
  • Weather conditions
  • Traffic separation schemes

Pilots are normally arranged well before arrival through the appointed local shipping agent.

Masters should ensure:

  • Pilot ladder complies with SOLAS requirements
  • Proper bridge communication
  • Updated ETA notifications
  • Safe boarding arrangements

Anchorage Information

Shanghai operates multiple designated anchorage areas for:

  • Waiting for berth
  • Cargo operations
  • Crew change arrangements
  • Bunkering
  • Surveys
  • Documentation
  • Quarantine inspection

Anchorage allocation depends upon:

  • Vessel size
  • Draft
  • Cargo
  • Port congestion
  • Terminal availability

Advance coordination with local authorities is recommended.


Immigration Procedures

Foreign crew are subject to Chinese immigration regulations.

Common immigration services include:

  • Crew signing on
  • Crew signing off
  • Transit crew
  • Medical disembarkation
  • Repatriation
  • Emergency visa assistance

Required documentation generally includes:

  • Passport
  • Seaman’s Book
  • Crew List
  • Visa (where applicable)
  • Letter of Guarantee
  • Immigration declarations

Processing time varies depending on voyage schedule and authority approval.


Customs Procedures

Shanghai Customs oversees all vessel-related cargo and ship operations.

Typical customs activities include:

  • Arrival declarations
  • Bonded stores
  • Spare parts clearance
  • Ship supplies
  • Temporary imports
  • Export cargo verification
  • Customs inspections

Accurate documentation significantly reduces inspection delays.


Crew Change Availability

Shanghai remains one of China’s primary crew change ports.

Services typically include:

  • Airport meet & assist
  • Hotel arrangements
  • Immigration formalities
  • Medical examinations
  • Launch boat transfers
  • Transportation
  • Visa coordination
  • Emergency crew replacement

Crew changes should be planned several days before arrival whenever possible.


Terminal Information

Shanghai consists of several specialized operational terminals.

Yangshan Deep Water Port

  • Ultra-large container vessels
  • Automated terminals
  • Deep-water berths

Waigaoqiao Terminal

  • Container operations
  • General cargo
  • Bulk cargo

Wusongkou Area

  • Passenger vessels
  • Government operations
  • Various commercial traffic

Luojing Terminal

  • Bulk cargo
  • Steel
  • Heavy project cargo

Terminal assignment depends on vessel type, cargo, charter instructions, and berth availability.


Local Regulations

Masters and operators should be aware of:

  • Strict environmental protection regulations
  • Ballast water compliance
  • Waste disposal requirements
  • ISPS security procedures
  • Speed restrictions
  • Mandatory pilotage
  • Local reporting requirements
  • Port State Control inspections

Failure to comply may result in operational delays or administrative penalties.


Emergency Contacts

A local shipping agent typically coordinates communication with:

  • Port Authority
  • Customs
  • Immigration
  • Maritime Safety Administration (MSA)
  • Pilot Station
  • Harbour Master
  • Terminal Operators
  • Medical Facilities
  • Surveyors
  • Tug Operators
  • Classification Societies

Emergency support is generally available 24 hours.


Operational Checklists

Arrival Checklist

✔ Submit ETA updates (72 / 48 / 24 hours)
✔ Confirm berth nomination
✔ Pilot booking completed
✔ Customs documentation submitted
✔ Immigration declarations prepared
✔ Crew list verified
✔ Cargo documents completed
✔ ISPS documentation available
✔ Ballast water documentation ready
✔ Safety certificates valid


Departure Checklist

✔ Cargo completed
✔ Bills of Lading finalized
✔ Pilot booked
✔ Tug assistance confirmed
✔ Customs clearance received
✔ Immigration clearance completed
✔ Port dues settled
✔ Navigation charts updated
✔ Departure weather reviewed
✔ Final ETD confirmed


Crew Change Checklist

✔ Crew passports
✔ Seaman’s Books
✔ Flight bookings
✔ Hotel reservations
✔ Immigration approvals
✔ Launch arrangements
✔ Medical certificates (if required)
✔ Transportation confirmed


Vessel Takeover Checklist

✔ Inventory verification
✔ Class attendance
✔ Delivery protocol signed
✔ Crew handover
✔ Flag documentation
✔ Technical records transferred
✔ Certificates verified


Port Call Planning Guide

Planning should begin at least 72 hours before arrival.

Coordinate:

  • ETA reporting
  • Berth allocation
  • Cargo readiness
  • Pilot booking
  • Immigration
  • Customs
  • Supplies
  • Technical attendance
  • Survey attendance
  • Crew logistics

Ship Supply Request Form

Typical requests include:

  • Fresh provisions
  • Bonded stores
  • Fresh water
  • Lubricants
  • Spare parts
  • Safety equipment
  • Cabin stores
  • Deck stores
  • Engine stores

Maritime Glossary

NOR (Notice of Readiness)

Formal notice issued by the Master declaring the vessel is ready for cargo operations.


Laytime

The contractually agreed period allowed for loading or discharging cargo.


Demurrage

Compensation payable when cargo operations exceed the agreed laytime.


SOF (Statement of Facts)

A chronological record of all operational events during the port call.


Free Pratique

Official permission granted by health authorities allowing the vessel to conduct port operations.


ETA

Estimated Time of Arrival.


ETD

Estimated Time of Departure.


ISPS Code

International Ship and Port Facility Security Code governing maritime security.


BAF

Bunker Adjustment Factor applied to freight to account for fuel price fluctuations.


BDN (Bunker Delivery Note)

Official document issued after bunkering confirming the quantity and specification of fuel supplied.


CTM (Cash to Master)

Cash delivered onboard for operational expenses and crew-related payments.


Husbandry Services

Comprehensive agency support including crew logistics, transportation, supplies, technical attendance, medical assistance, documentation, and coordination with local authorities.


Case Studies

Emergency Crew Replacement

A vessel reported an unexpected medical disembarkation less than 24 hours before departure. Zenova coordinated immigration approvals, airport transfers, hotel arrangements, launch services, and onboard joining for the replacement officer, allowing the vessel to sail without schedule disruption.


Last-Minute Spare Parts Delivery

Critical engine components arrived only hours before the vessel’s scheduled departure. Customs clearance, transportation, and terminal access were expedited, enabling safe onboard delivery before pilot boarding.


Successful Vessel Takeover

During a vessel ownership transfer, documentation, classification attendance, inventory verification, and crew coordination were completed within the scheduled port stay, ensuring a seamless operational handover.


Regulations & Updates

Stay informed about:

  • Chinese Customs regulations
  • Immigration policy updates
  • Health and quarantine requirements
  • Maritime Safety Administration notices
  • Environmental compliance measures
  • IMO regulatory amendments
  • Port operational circulars
  • Terminal-specific advisories

72 Hours Before Arrival

ETA Confirmation

Documentation Review

Pilot Booking

Berth Planning

Customs & Immigration Clearance

Vessel Arrival

Cargo Operations

Crew Change / Technical Attendance

Final Documentation

Departure Clearance

Pilot Boarding Outbound

Post-Port Reporting